Building in winter. How to fight the water marks?
Construction and renovation works are best performed in summer when the weather is fine, sun is shining, it is warm, and humidity is acceptable. However, not all can be planned for summer and sometimes you need to make renovation
Wet plasters. How to speed up renovation works?
Construction and renovation works are not easy, particularly in autumn and winter when the weather is changeable. Low temperatures, rain and wind are not favourable conditions for building structures, and particularly for drying after construction works. The reason is
How to avoid mould and fungi in your flat?
Appropriate air humidity is very important not only for the building walls, correct operation of equipment or processes, but also for health and wellbeing of people staying in the rooms. Very low humidity makes the air dry, and high
How to dry wet walls quickly?
Almost everybody has experienced such problems as flat flooded by a neighbour or a broken water pipe. Property damage or unpleasant odour is not the end of trouble, because the struggle with insured for compensation sometimes is as long
Use of air drying
Adequate air drying is important not only for wellbeing of people present in the room or correct operation of machinery and equipment, but also for risk of occurrence of mould and fungi on damp surfaces and for ensuring correct
Drying and drying methods
Generally, drying is a process during which vapour is removed from air by means of using suitable methods and equipment. Most often it is achieved by lowering the air temperature or by vapour adsorption by special adsorbents in the
Zasady eksploatacji osuszaczy powietrza
W przemyśle i budownictwie do osuszania powietrza stosuje się głównie dwa typy osuszaczy: kondensacyjne i adsorpcyjne, przy czym ten pierwszy rodzaj stosowany jest zdecydowanie najczęściej. Osuszacz kondensacyjny zwany także ziębniczym zasadą działania przypomina typową chłodziarkę, a wilgoć wytrąca się